BHS

BHS:
Building on
Excellence

Streamlines

Home


News

Phase:
One
Two
Three
Four
Timetable
Drawings
Photos
Architects
History
FAQ
Search

Streamlines

BHS
Homepage


District
Homepage

Bartlesville High School:
Building on Excellence

Phase Four: Library, Link, Renovations

Balcony Conference Room,
February 22, 2007

You can click and drag the image to look around, or click the gray buttons to zoom, spin, change the viewing mode, etc.


The west end of the old auditorium balcony is being renovated into a conference room. The old projection booth will remain as a storage closet. At Granger Meador's urging, the east end was turned into a storage room and a hallway for handicapped access a decade ago - the hallway was dubbed the "Quantum Tunnel" because it led from the 2nd floor directly to the top floor of the annex, which back then was called the 5th floor. That area is being reworked into a permanent corridor.

The balcony floor has been built up on metal frames and a new concrete deck poured to provide a level surface.

Viewpoint Map

Conference Room PixAround List | Phase Four Page


Please direct any comments or suggestions regarding this page to:
Granger Meador, gmeador@bps-ok.org
Bartlesville High School