BHS

BHS:
Building on
Excellence

Streamlines

Home


News

Phase:
One
Two
Three
Four
Timetable
Drawings
Photos
Architects
History
FAQ
Search

Streamlines

BHS
Homepage


District
Homepage

Bartlesville High School:
Building on Excellence

Phase Four: Connecting Link

Connecting Bridge,
Prior to Construction

You can click and drag the image to look around, or click the gray buttons to zoom, spin, change the viewing mode, etc.


This photo, taken back in 2004 prior to construction, shows the skywalk connecting the stadium and the annex. It will be replaced with a two-story connecting building that includes an elevator.

Viewpoint Map

Bridge PixAround List | Phase Four Page


Please direct any comments or suggestions regarding this page to:
Granger Meador, gmeador@bps-ok.org
Bartlesville High School