|

BHS: Building on Excellence
Home
News
Phase:
One
Two
Three
Four
Timetable
Drawings
Photos
Architects
History
FAQ
Search
BHS Homepage
District Homepage
|
Bartlesville High School: Building on Excellence
Phase Four: Connecting Link
Connecting Bridge Interior, Lower Level June 2, 2007
You can click and drag the image to look around, or click the gray buttons to zoom, spin, change the viewing mode, etc.
This photo shows the first floor of the connecting bridge between the stadium and the annex. It will include a stairway and elevator to the middle floors of each building, and on this lower level also leads to the connecting link to the field houses and Fine Arts Center. Masonry is going up.
|