|

BHS: Building on Excellence
Home
News
Phase:
One
Two
Three
Four
Timetable
Drawings
Photos
Architects
History
FAQ
Search
BHS Homepage
District Homepage
|
Bartlesville High School: Building on Excellence
Phase Four: Connecting Link
Connecting Bridge Interior, Lower Level July 1, 2007
You can click and drag the image to look around, or click the gray buttons to zoom, spin, change the viewing mode, etc.
The floor for the upper level of the bridge has been poured, so this first level now has a ceiling. Part of the stairway between the levels is in place, and you can glimpse the underside of the stairs from the upperlevel of the bridge down into the middle level of the stadium.
|