|

BHS: Building on Excellence
Home
News
Phase:
One
Two
Three
Four
Timetable
Drawings
Photos
Architects
History
FAQ
Search
BHS Homepage
District Homepage
|
Bartlesville High School: Building on Excellence
Phase Four: Connecting Link
Connecting Bridge Interior, Upper Level July 1, 2007
You can click and drag the image to look around, or click the gray buttons to zoom, spin, change the viewing mode, etc.
The floor for this upper of the bridge has been poured. This level will simply connect the middle floors of the annex and stadium either via a stairway down into the stadium or an adjacent elevator. You will go down one level to access the link to the south buildings, the exterior, and the lower levels of the annex and stadium.
|