|

BHS: Building on Excellence
Home
News
Phase:
One
Two
Three
Four
Timetable
Drawings
Photos
Architects
History
FAQ
Search
BHS Homepage
District Homepage
|
Bartlesville High School: Building on Excellence
Phase Four: Library, Link, Renovations
Old Auditorium Becomes New Library, January 26, 2007
You can click and drag the image to look around, or click the gray buttons to zoom, spin, change the viewing mode, etc.
You can see two big openings under the balcony: the one on the left is framed to become the library entrance, while the other will become a glass-walled corridor leading from the main foyer to the middle floor of the 1958 annex, through the first of the three openings in the side wall. Drywall has sealed up the big old door that used to lead onto the stage from the exterior, and is in place in the library annex, office, and alumni room. Framing to build up a level floor for the balcony is in place, as are some light fixtures.
|