Phase One: Front Lawn Redesign
PixAround Views* forFront Lawn
Before Construction (1/29/02) Removing Sidewalk and Curb (5/30/02) Clearing for Lots and Circle Drive (6/10/02) Hillcrest Curbing; Fill Work (6/20/02) Curbs and Sidewalks (7/9/02) Curbs Finished (7/17/02) Asphalt and Striping (7/30/02) Phase One Finished (8/16/02)
The available views look west from atop the old auditorium.