BHS

BHS:
Building on
Excellence

Streamlines

Home


News

Phase:
One
Two
Three
Four
Timetable
Drawings
Photos
Architects
History
FAQ
Search

Streamlines

BHS
Homepage


District
Homepage

Bartlesville High School:
Building on Excellence

Phase Three: Field House

View Midway Along 18th Street,
Week 60

You can click and drag the image to look around, or click the gray buttons to zoom, spin, change the viewing mode, etc.


This photo was taken at the start of the sixtieth of construction on November 27, 2005. You are standing midway along 18th street just southeast of the new Fine Arts Center.

In the above image the EIFS (Exterior Insulating Finish System) is being finished. Below is a close-up of the process. At the far left of the new construction is bare concrete block. As you proceed right you see that block covered by sculpted bright white styrofoam. The styrofoam is then covered in a gray coating. The final finish applied over that has the desired darker shade of white.

EIFS
Viewpoint Map

18th Midway PixAround List
Phase Three Page | Photos Page


Please direct any comments or suggestions regarding this page to:
Granger Meador, gmeador@bps-ok.org
Bartlesville High School