Phase Two: Science Wing
View of AP & Inquiry Physics Lab, Forty-One Weeks Into Construction
You can click and drag the image to look around, or click the gray buttons to zoom, spin, change the viewing mode, etc.
This photo was taken after 41 weeks of construction on March 7, 2003. The most obvious change is that a coat of primer has been applied to the masonry walls. The windows have now been installed, although they lack horizontal false dividers which will be installed later. The metal studs above the masonry have been installed, and some have their drywall coverings in place.
|