Bartlesville High School:
Building on Excellence

Phase Two: Science Wing

View of 1st Floor Corridor,
Thirty-Eight Weeks Into Construction

You can click and drag the image to look around, or click the gray buttons to zoom, spin, change the viewing mode, etc.

This photo was taken at the end of 38 weeks of construction on February 14, 2003. You are standing near the east wall of the first floor corridor, near the Student Projects Room.

The masonry and the electrial, plumbing, and mechanical rough-ins are almost complete. Metal studs are being installed above the interior masonry walls.

Looking down the hall, you can now see the wooden interior doors leading into the main building. The old exterior doors and stairway handrails have been demolished, and the old stairs are covered. Now one can walk directly from the first floor of the 1939 building onto this floor.