Bartlesville High School: Building on Excellence
Phase Two: Science Wing
View of 2nd Floor Corridor, Forty-Three Weeks Into Construction
You can click and drag the image to look around, or click the gray buttons to zoom, spin, change the viewing mode, etc.
This photo was taken after 43 weeks of construction on March 22, 2003. You are standing near the east wall of the second floor corridor, near the future chemical stockroom.
You'll notice that the connection has been made into the old chemistry stockroom on the second floor of the main building. Eventually some of those walls will be demolished.
The first coats of wall and frame paint have been applied in the new structure. The electrical, plumbing, and ductwork top-out is complete, and the ceiling grid is being installed.
|