BHS

BHS:
Building on
Excellence

Streamlines

Home


News

Phase:
One
Two
Three
Four
Timetable
Drawings
Photos
Architects
History
FAQ
Search

Streamlines

BHS
Homepage


District
Homepage

Bartlesville High School:
Building on Excellence

Phase Two: Fine Arts Center

Upper Connecting Spine,
Ninety-Seven Weeks Into Construction

You can click and drag the image to look around, or click the gray buttons to zoom, spin, change the viewing mode, etc.


This photo was taken at the end of the 97th week of construction on April 2, 2004. You are standing in the upper level of the connecting spine that will eventually link the Fine Arts/Field House lobby to the rest of the campus.

The ceiling tiles are mostly in. The handrails now have a wood top. And the floor tiles have been laid, although their colors are dulled by a layer of dust.

Viewpoint Map


Spine PixAround List
Fine Arts Interior PixArounds | Phase Two Page


Please direct any comments or suggestions regarding this page to:
Granger Meador, gmeador@bps-ok.org