BHS

BHS:
Building on
Excellence

Streamlines

Home


News

Phase:
One
Two
Three
Four
Timetable
Drawings
Photos
Architects
History
FAQ
Search

Streamlines

BHS
Homepage


District
Homepage

Bartlesville High School:
Building on Excellence

Phase Two: Fine Arts Center

Auditorium Stage,
Forty-Nine Weeks Into Construction

You can click and drag the image to look around, or click the gray buttons to zoom, spin, change the viewing mode, etc.


This photo was taken after 49 weeks of construction on May 4, 2003. You are standing in the area that will be the stage in the new auditorium.

The concrete bases for some of the main floor raised seating have been poured. The steel for the entrances to the balcony is up - look for the curved steel above the side doorways. Structural steel is almost complete, and the high areas are being closed in with metal studs, gypsum board, and EIFS (exterior insulation finish system). The far lower floor areas to the northeast are also being sealed up.

Viewpoint Map


Stage PixAround List
Fine Arts Interior PixArounds | Phase Two Page


Please direct any comments or suggestions regarding this page to:
Granger Meador, gmeador@bps-ok.org