BHS

BHS:
Building on
Excellence

Streamlines

Home


News

Phase:
One
Two
Three
Four
Timetable
Drawings
Photos
Architects
History
FAQ
Search

Streamlines

BHS
Homepage


District
Homepage

Bartlesville High School:
Building on Excellence

Construction Update:
Connecting Link, 11/22/2006

Previous Update | Next Update
Construction

As part of the ongoing improvements at BHS, the 48-year-old skybridge linking the annex and stadium was demolished on November 22, 2006. Gorman Construction of Bartlesville hired Ark Wrecking Company to conduct the demolition. Mr. Miller, who oversees BHS Site Safety, aimed one of the security cameras at the bridge and created a movie clip of its destruction, which was edited into the above form by Granger Meador, BHS Volunteer Webmaster.

Eventually a new two-story structure with elevator at the location will provide handicapped access to the two older buildings and serve as a gateway to an enclosed connecting link leading to the new Fine Arts Center both the new and old field houses.


Building on Excellence Home Page

Bartlesville High School Home Page


Please direct any comments or suggestions regarding this page to:
Granger Meador, Bartlesville High School
gmeador@bps-ok.org